0912.106.656ttk.jsc.vietnam@gmail.com
TTK Energy
Factory metal roof covered with solar panels, limestone mountains in the distance

Energy for businesses in Ninh Binh

Solar by day, battery for the evening peak, and every kWh visible through EMS.

TTK surveys, meters, designs and installs hybrid solar on factory, hotel and workshop roofs. Enter your electricity bill and the calculator returns a system size and a savings range.

1,166 kWh

per kWp per year in Ninh Binh (PVGIS, 10° roof)

0.248 kWp/m²

power density of the Hi-MO X10 670 W panel

5 steps

from survey to operation

How a hybrid system works

In daytime the panels power your machines. Surplus charges the battery for the evening. The EMS meters every flow and decides when to charge and discharge.

Technical room with battery cabinets and inverters
Panels Hybrid inverter Load Battery EVN EMS
  1. Panels Turn sunlight into DC power on the roof.
  2. Hybrid inverter Converts to AC and splits power between load, battery and grid.
  3. Battery Stores daytime surplus for when you need it.
  4. EMS Meters, controls and reports energy by hour and by month.

Three packages to start from

Each package is a starting configuration. Exact capacity and storage are fixed only after load metering.

A

Package A: Grid-tied + EMS

For factories that run mostly in daytime

  • Rooftop panels
  • Grid-tied inverter
  • EMS metering per feeder

B

Package B: Hybrid + small battery

For workshops with short load peaks

  • Rooftop panels
  • Hybrid inverter
  • Small peak-shaving battery
  • EMS control

C

Package C: Hybrid + large battery

For hotels and sites with heavy evening use

  • Rooftop panels
  • Hybrid inverter
  • Large storage battery
  • EMS control and reporting

No fixed list prices: Cost depends on roof, load and equipment, and is quoted in writing after a survey.

From survey to operation in 5 steps

Two technicians installing rooftop panelsAerial view of an industrial park with solar panels on factory roofs
  1. 1

    Survey

    Check the roof, structure, switchboards and 3–12 months of bills.

  2. 2

    Load metering

    Install EMS meters for a few weeks to get a real hourly load profile.

  3. 3

    Design and quote

    Size the PV and battery, draw the connection; written quotation.

  4. 4

    Install and accept

    Install, test, accept with you and complete utility procedures.

  5. 5

    Operate

    Monitor through EMS, monthly reports, scheduled maintenance.

Transparent payment

Contract milestones

Pay by the milestones in the contract: Signing, equipment delivery, acceptance.

Bank financing

If you borrow, TTK prepares the technical data for your application. Loan terms are set by the bank.

Written quotations

Every quotation lists equipment, model numbers, warranties and installation time.

Company profile

Founded in 2011, TTK has its head office in Hanoi and a representative office in Ninh Binh, and has worked with many FDI factories in Ninh Binh.

View details

Frequently asked questions

How much can solar save?

It depends on your daytime load, roof area and tariff. The calculator gives an estimated range; firm numbers come after EMS load metering.

What is the difference between hybrid and grid-tied?

A grid-tied system only supplies power while the sun shines. A hybrid adds a battery to store surplus for the evening or outages.

Can panels go on a metal roof?

Yes, if the structure can carry the load. The Hi-MO X10 weighs 28.5 kg per panel, lighter than the Hi-MO 7 (33.5 kg), and suits metal factory roofs. TTK checks the structure during the survey.

Is battery storage safe?

Batteries need a proper location, protection devices and fire safety. TTK shows the location and protection in the design file for your approval.

What warranties apply?

Panels are warranted by the manufacturer: Hi-MO X10 15 years product, Hi-MO 7 12 years, both 30 years power output. Installation is warranted by TTK under the contract.

Can surplus power be sold to the grid?

Rules on selling rooftop solar surplus change over time. TTK checks the current regulations and works with the utility for each project; the web calculator does not count export revenue.

How long does installation take?

It depends on capacity and procedures. The schedule is stated in the quotation after the survey.

What is the EMS for?

The EMS meters each feeder, shows how much grid power solar has replaced, and produces monthly reports for your customers or parent company.

Request a survey

Up to 5 fields. TTK uses them only to contact you about your request.

CallZaloRequest a survey